500 West Fifth Renovation, Winston-Salem NC
Job: 500 West Fifth Building
Location: Winston-Salem
Building: Former GMAC Insurance Building
Equipment Used: Systems scaffold and stairs
Need for Equipment: Asbestos abatement
This scaffolding structure was built from system ring lock scaffold and designed in an L shape around the building. It was approximately 300 feet long and 82 feet high.